Project Of The Month

November's Project Of The Month

Supancic Excavating, Inc

Job Description: This project involved preparing the site for an Elliott Company sub-station. The work included excavating 5,000 cubic yards of soil and leveling the ground, followed by constructing a 300-foot-long Redi-Rock wall.

Additional tasks included installing storm sewer pipes and inlets and constructing a rock buttress to stabilize the slope leading to the parking lot. Concrete piers, ranging from 3 to 8 feet in diameter, were drilled and installed. Once the electrical work was finished, gravel was spread over the entire site.

OCTOBER'S PROJECT OF THE MONTH

Best Tunneling & Boring LLC 

Job Description: 500-foot-long tunnels constructed with 72-inch and 60-inch Hobas pipe beneath an active runway. These tunnels are interconnected with open-cut 72-inch RCP, alongside manhole installations and canal work.

PROJECT OF THE MONTH

Want to be featured as next month's Project Of The Month?
Send us your pictures or videos and fill out the quick form by clicking the button below.
 

SHARE YOUR BEST PROJECT 

 
 
 
DMCA.com Protection Status