Job Description: This project involved preparing the site for an Elliott Company sub-station. The work included excavating 5,000 cubic yards of soil and leveling the ground, followed by constructing a 300-foot-long Redi-Rock wall.
Additional tasks included installing storm sewer pipes and inlets and constructing a rock buttress to stabilize the slope leading to the parking lot. Concrete piers, ranging from 3 to 8 feet in diameter, were drilled and installed. Once the electrical work was finished, gravel was spread over the entire site.
Job Description: 500-foot-long tunnels constructed with 72-inch and 60-inch Hobas pipe beneath an active runway. These tunnels are interconnected with open-cut 72-inch RCP, alongside manhole installations and canal work.