Job Description: 2025 Peterbilt 567 Dump Grapple Crane Truck pictured. This project shows the cleanup from the aftermath of Hurricane Milton that hit the west coast of Florida. Debris Dog offers immediate hurricane, tornado, and storm cleanup, which is imperative after a disaster.
Story: " Thanks to Commercial Credit Group and our dedicated sales manager, I was able to quickly finance two new grapple trucks for my business to provide clean up and provide assistance to my customers."
Job Description: This project involved preparing the site for an Elliott Company sub-station. The work included excavating 5,000 cubic yards of soil and leveling the ground, followed by constructing a 300-foot-long Redi-Rock wall.
Additional tasks included installing storm sewer pipes and inlets and constructing a rock buttress to stabilize the slope leading to the parking lot. Concrete piers, ranging from 3 to 8 feet in diameter, were drilled and installed. Once the electrical work was finished, gravel was spread over the entire site.
Job Description: 500-foot-long tunnels constructed with 72-inch and 60-inch Hobas pipe beneath an active runway. These tunnels are interconnected with open-cut 72-inch RCP, alongside manhole installations and canal work.